We've also got a lot of the lights put in around the building, replacing all the older fixtures. All the lights were at least 30 years old - some older.
The dining room
We've started work on the dining room. Not much to do in there except remove the walls, insulate and re-gyprock.
Stripping walls is time consuming, but we've managed to cut that time down by being a little more violent with the wall. When we started, we were quite gentle with the plaster, picking pieces of lathe off one by one with a wrecking bar. We've learnt not to go too close to electrics, but otherwise you can be a lot quicker with piece of 2 by 4. Open up the wall with the wrecking bar, or drill and reciprocating saw/circular saw, then slide the 2 by 4 in and pull back. The plaster peels off the wall in sheets, and the lathe just pops off. Now all we've got to do is work out a quick way to make sure all the nails come out of the studs. Currently we're taking them out, one by one with the wrecking bar or claw hammer. Using this technique though, we managed to strip, insulate, vapour barrier, and started to gyprock a 16ft wall in two days. Considerably faster than the week it took to just strip the walls in the nursery.
2 comments:
Amazing work. Totally going for it. Well done both of you.
Tia xx.
Amazing work. Totally going for it. Well done both of you.
Tia xx.
Post a Comment